
Wraparound Extension Drawings in Harefield UB9
Fixed-fee, MCIAT-chartered wraparound extension drawings for Harefield (UB9) homeowners — London Borough of Hillingdon validation and local constraints handled from the start.
Harefield (UB9) is one of Hillingdon's most rural neighbourhoods — a historic village core wrapped in Green Belt on the northern edge of the borough — and that setting, rather than a standard suburban street pattern, drives how extensions are assessed here. Schemes that keep additions subordinate and in-keeping with the village grain are the ones that move smoothly through the council.
The Harefield Village conservation area protects the scattered building layout, the green and the countryside views, so rooflines, materials and the openness between buildings are treated as part of the heritage. We check both the conservation-area boundary and the surrounding Green Belt designation before advising on what a UB9 plot can realistically support.


Planning in Harefield (UB9): what to know before you apply
UB9 combines two of the strongest planning controls in the borough — a rural conservation area and widespread Green Belt — so extension scale and siting matter more here than almost anywhere else in Hillingdon. We design Harefield schemes to read as modest, subordinate additions that respect the village setting, which is what the council looks for.
Typical Harefield housing stock
A dispersed village centre of cottages and period houses around the green and St Mary's Church, mixing medieval and post-medieval buildings with Victorian and 20th-century infill, set against open countryside on the borough's northern edge.
Streets we regularly draw for in Harefield
High Street · Church Hill · Park Lane · Rickmansworth Road
Wraparound Extension Drawings for Harefield (UB9) homes: the package and the process
Every wraparound extension drawings we prepare for an Harefield property is drawn to London Borough of Hillingdon’s validation standards and tuned to the UB9 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
A wraparound extension is what happens when a rear extension and a side return are designed together rather than as two separate projects: the new build wraps around the back corner of the house, turning a galley kitchen and a small rear room into one continuous kitchen, dining and living space running the full width of the plot. It is the most ambitious single-storey option most London terraces and semi-detached houses have, and because it reshapes almost the entire ground floor, it needs careful structural and drainage planning as well as a confident planning application.
DrawingsDirect draws wraparound extensions for full planning and building regulations, with structural calculations for the L-shaped frame and any drainage diversion produced in-house by our MCIAT-chartered team, on a fixed fee. If your project is a single-storey rear addition or a side infill on its own, see our Rear Extension and Side Return Extension pages; if you also want a second storey, see Double Storey Extension Drawings.
What makes a wraparound extension different from a rear or side return alone?
A rear extension adds depth at the back of the house; a side return adds width down the alley; a wraparound does both at once, so the new floor area turns the corner of the original building rather than sitting against just one wall. The result is typically the largest open-plan space a single-storey extension can deliver, but it also means more of the original external wall is removed and more of the roof is new, which raises the structural and drainage stakes compared with either extension on its own. Homeowners who start out planning a rear extension or a side return alone often move to a wraparound once they see how little extra it costs to combine the two, since much of the groundwork, roof structure and glazing is shared between them rather than duplicated.
Do wraparound extensions need full planning permission in London?
Almost always, yes. Permitted development allowances are calculated on combined additions to the original house, and a wraparound's depth plus width together generally exceed the volume and footprint limits that apply to a rear extension or side extension considered separately. A Lawful Development Certificate route is rarely viable for a genuine wraparound.
Conservation area status and Article 4 directions, common across the terraced streets where wraparound extensions are most popular, remove permitted development rights further still, so we design every wraparound on the assumption it will go through full householder planning.
| Route | What it covers | Typical fee |
|---|---|---|
| Full planning permission | Required for almost all wraparound extensions given the combined footprint | Full Planning pack ~£1,600–£2,400 |
| Planning + Building Regulations (structural) | Combined pack including structural calculations for the L-shaped frame and drainage diversion | Planning + Building Regs pack ~£2,200–£3,850 |
| Rear extension alone (comparison) | Smaller single-storey addition, may qualify for permitted development | see Rear Extension Drawings, from £1,100 |
| Side return alone (comparison) | Widens the kitchen only, keeps garden depth unchanged | see Side Return Extension Drawings, from £1,400 |
Wraparound Extension Drawings in Harefield UB9 — FAQs
How much does a wraparound extension cost to design in London?+
Does a wraparound extension always need planning permission?+
Do I need an architect for a wraparound extension?+
Will I need a Party Wall Agreement for a wraparound extension?+
How long does it take to get wraparound extension drawings?+
Do I need planning permission for a loft conversion in Hillingdon?+
How does the Colne Valley green belt affect my Hillingdon project?+
Does proximity to Heathrow affect my plans?+
How long does Hillingdon Council take to decide?+
How much do planning drawings cost in Hillingdon?+
Get your free Harefield planning assessment
Tell us your Harefield (UB9) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.