MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportBuilding Regulations Drawings in London

Finished open-plan kitchen extension in a London home built to building regulations standards
Building Regulations Drawings

Building Regulations Drawings in London | Full Plans

Full-plans construction packages with structural calculations, coordinated in-house.

Get your fixed-fee quote

60 seconds now. A no-obligation fixed quote back within one working day — with a free planning appraisal.

No obligation · No spam · Reply within 1 working day
Open-plan London interior created by an approved building regulations drawings project
Isometric illustration of a London home extension design
Proposed floor plan
MCIAT chartered

Where planning drawings gain design consent, building regulations drawings prove your project meets the technical standards for a safe, warm, structurally sound building. DrawingsDirect produces full-plans building control packages for London extensions, lofts and conversions, with structural calculations produced in-house rather than subcontracted.

Fixed fees from £1,400 · Drawings in ~7 days · Free redraws to approval.

What do building regulations drawings cover?

A building control package translates the approved design into a buildable, compliant specification.

  • Construction sections and detailed junctions
  • Structural drawings and calculations (steel beams, foundations, loadings)
  • Part L thermal performance and insulation specification
  • Fire safety — escape routes, protected structure, alarms
  • Drainage and ventilation layouts

Full Plans or Building Notice — which should I choose?

A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly.

Why coordinate structural calculations in-house?

When the same team draws the building and calculates its structure, the steel schedule matches the drawings and the builder never waits on a missing detail. It removes the classic gap between an architect's drawings and a separately-appointed engineer's calculations.

What energy and insulation standards apply under Part L?

New extensions and conversions must meet the Part L thermal standards — target U-values for walls, roof, floor and glazing, controlled ventilation, and limits on overall heat loss. For a London period property that often means achieving those figures within tight existing structures. We specify wall, roof and floor build-ups that meet Part L without eating into the space you are gaining, and set them out clearly for Building Control and your builder.

When does my project need structural calculations?

Any project that removes a load-bearing wall, forms a large opening, or adds load — a new loft floor, a rear-extension roof, or a steel beam over bi-fold doors — needs structural calculations to prove the structure is safe. We produce the structural drawings and calculations in-house alongside the building regulations set, so the beam sizes shown on the drawing are the beam sizes in the calculations, with no gap for a builder to query on site.

Full Plans vs Building Notice for a London project
FactorFull PlansBuilding Notice
Drawings checked before work startsYesNo
Up-front certaintyHigh — approval in writingLower — inspected as built
Best forExtensions, lofts, structural workMinor, simple works
Evidence for lenders and buyersFull approval recordCompletion certificate only
Risk of costly on-site reworkLowHigher if issues are found late
By Borough

Building Regulations Drawings in your London borough

Local planning constraints, conservation areas and Article 4 notes for each council.

Browse all London boroughs
FAQ

Building Regulations Drawings — frequently asked questions

Do I need building regulations approval as well as planning permission?+
Almost always, yes. Planning permission covers what the building looks like; building regulations cover how safely it is built. Most extensions and loft conversions need both.
How long does Building Control approval take?+
A Full Plans application is typically assessed within about five weeks. We prepare a complete package and respond to any conditions promptly, so approval is not held up by missing detail.
Can building regulations drawings be done after planning approval?+
Yes. Many homeowners secure planning permission first, then commission the building regulations package before starting on site. We can pick a project up at either stage.
Are structural calculations included?+
Yes — we produce structural drawings and calculations in-house as part of the building regulations package, so your builder has everything to price and build.
Can you submit to Building Control for me?+
Yes, we prepare and submit the Full Plans package and respond to any Building Control queries.
Free Fixed Quote

Ready for building regulations drawings that get approved?

Tell us your London address and project. We'll confirm feasibility and a fixed fee within one working day — with a free planning appraisal of your property's potential.