MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportHouse Extension Drawings in Westminster

Red-brick mansion block and stucco terraces of the kind that dominate Westminster's Pimlico and Marylebone
Westminster · London

House Extension Drawings in Westminster

Fixed-fee, MCIAT-chartered house extension drawings for Westminster homeowners — Westminster City Council validation and local constraints handled from the start.

Free Westminster planning assessment

Tell us your Westminster address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Westminster is among the most heritage-dense authorities in the country: the great majority of its housing sits within a conservation area — Belgravia, Mayfair, Pimlico, Bayswater, Maida Vale and St John's Wood among them — listed buildings are commonplace, and much of the residential stock is mansion-block or garden-square terrace where external alterations are tightly controlled. The character runs from stucco-fronted Georgian and Victorian townhouses and garden-square terraces to red-brick and Portland-stone mansion blocks across the West End and Marylebone. Permitted development rarely applies, and applications turn on careful, context-led drawings and, frequently, listed-building consent.

Because so much of the city lies within a conservation area and a high proportion of buildings are listed, a full planning application — and often listed-building consent — is usually required even for modest works in Belgravia, Mayfair, Pimlico or Bayswater. The City Plan basement policy requires a basement impact assessment and limits the scale of any below-ground extension, and mansion-block and estate-management leases frequently require the freeholder's consent alongside planning, since either the council or the freeholder can block an otherwise sound proposal. We take a validation-first approach, resolving the conservation, listing, basement and lease position for your exact address before a line is drawn.

We prepare Westminster planning and listed-building submissions to the council's exacting validation and design standards, producing the same council-accepted drawings an architect would — usually at around 30% less. The fee is fixed and agreed up front, drawings typically turn around in about seven days, and we redraw free until the council approves. Most householder applications are determined within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation, so a complete, correctly scaled submission that answers the heritage questions early is the best way to keep the application moving.

Red-brick mansion block and stucco terraces of the kind that dominate Westminster's Pimlico and Marylebone
Isometric illustration of a Westminster home extension design
Proposed floor plan
Westminster

Planning in Westminster: what to know before you apply

Because the great majority of Westminster falls within a conservation area — and a high proportion of buildings are listed — a full planning application, and often listed-building consent, is usually required even for modest works. The City Plan basement policy requires a basement impact assessment and limits scale, and mansion-block leases frequently require the freeholder's consent alongside planning. We resolve these before drawing.

Typical Westminster housing stock

Stucco-fronted Georgian and Victorian townhouses, garden-square terraces, red-brick and Portland-stone mansion blocks, and a very high concentration of listed buildings across the West End and the garden squares.

Areas we regularly draw for in Westminster

Belgravia · Mayfair · Pimlico · Marylebone · Bayswater · Maida Vale · St John's Wood · Westminster

House Extension Drawings for Westminster homes: the package and the process

Every house extension drawings we prepare for a Westminster property is drawn to Westminster City Council’s validation standards and tuned to the local constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

A well-drawn extension adds space and value while sailing through the council; a poorly-drawn one triggers objections and refusals. DrawingsDirect draws rear, side-return, wraparound, double-storey and basement extensions for London homes — sized to your borough's tolerances, with daylight and neighbour impact considered before the planners raise them.

Which extension types do you draw?

Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.

Rear extension

A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.

Side-return

Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.

Wraparound

Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.

Double-storey

Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.

Basement

Creates space downward where footprint is limited, with structural and party-wall care.

Do I need planning permission for a house extension in London?

Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing.

Typical London extension drawing packages
ExtensionTypical routePackageFee from
Single-storey rearPermitted development / householderPlanning + building regs£1,100
Side-returnHouseholder planningPlanning + building regs + structural£1,600
WraparoundHouseholder planningFull package + structural£2,200
Double-storeyHouseholder planningFull package + structural£2,400
FAQ

House Extension Drawings in Westminster — FAQs

How far can I extend without planning permission in London?+
Under permitted development, single-storey rear extensions can reach 3m (terraced/semi) or 4m (detached), or up to 6–8m under the prior-approval larger-home scheme — but conservation areas and Article 4 directions can remove these rights. We check your property first.
Do extension drawings include structural calculations?+
Our full package includes structural drawings and calculations coordinated in-house, so your builder can price and build without waiting on an engineer.
How long do extension drawings take?+
Typically about 7 days from survey to a full drawing set delivered to your online portal.
Will my rear extension need a party wall agreement?+
If you build up to or on a shared boundary, excavate near a neighbour's foundations, or cut into a party wall for a steel, the Party Wall etc. Act 1996 usually applies. Our drawings show the works clearly so a party wall surveyor — or your neighbour — can see exactly what is proposed, which keeps that process quick.
Can I extend a house in a conservation area?+
Yes, but conservation areas and Article 4 directions commonly remove permitted development for rear and side extensions, so the work needs a full householder application designed to the council's heritage guidance. We confirm your property's designation before recommending a route.
Do I need planning permission for works in Westminster?+
Almost always. The great majority of Westminster falls within a conservation area and a high proportion of buildings are listed, so a full planning application — and often listed-building consent — is usually required even for modest works. Permitted development rarely applies. We screen conservation, listing and lease constraints for your address before recommending a route.
I live in a mansion block — what extra consent might I need?+
Much of Westminster's stock is mansion-block or garden-square terrace, and the lease frequently requires the freeholder's consent alongside planning for external alterations. We confirm the lease position early and design a scheme that satisfies both the freeholder and the council, since either can block an otherwise sound proposal.
Will I need a Basement Impact Assessment in Westminster?+
Usually, for below-ground works. The City Plan basement policy requires a basement impact assessment and limits scale. If you are considering a basement or lower-ground extension we flag the requirement early and coordinate the structural and drainage input so the application is complete when submitted.
How long does Westminster City Council take to decide?+
Westminster determines most householder applications within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation. We prepare submissions to the council's exacting validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Westminster?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. Heritage-led, listed-building and basement schemes require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Westminster planning assessment

Tell us your Westminster address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.