
Structural Drawings in West Hampstead NW6
Fixed-fee, MCIAT-chartered structural drawings for West Hampstead (NW6) homeowners — London Borough of Camden validation and local constraints handled from the start.
West Hampstead in NW6 is a dense band of red-brick Victorian and Edwardian terraces and mansion blocks strung along its three stations, with a very high rate of flat conversion. Work here is dominated by rear extensions, loft conversions and the reconfiguration of converted flats, where ownership and access arrangements matter as much as the planning application itself.
Because conservation designations such as West End Green and Priory Road control the characteristic red-brick frontages, we keep original detailing and roof profiles intact and prepare the drawings and supporting statements Camden Council requires, while co-ordinating the party-wall and leasehold issues that flat-conversion sites inevitably raise.


Planning in West Hampstead (NW6): what to know before you apply
No published householder Article 4 direction applies, but conservation-area coverage over key streets governs frontages and rooflines, and the area's heavy flat-conversion pattern makes leasehold and party-wall matters central to most projects.
Typical West Hampstead housing stock
Dense red-brick Victorian and Edwardian terraces and purpose-built mansion blocks line the streets around the three West Hampstead stations. A very high proportion of houses have been converted into flats, giving the area a distinctly sub-divided residential grain.
Streets we regularly draw for in West Hampstead
Fordwych Road · Sumatra Road · Dennington Park Road · Broomsleigh Street
Structural Drawings for West Hampstead (NW6) homes: the package and the process
Every structural drawings we prepare for an West Hampstead property is drawn to London Borough of Camden’s validation standards and tuned to the NW6 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Structural drawings and calculations are the technical backbone of almost every London home improvement — removing a wall between a kitchen and dining room, inserting a steel beam (often called an RSJ) to open up a room, digging foundations for a rear extension, or checking that an existing roof and floor can safely carry the extra load of a loft conversion. Building Control will not sign off any of this work without a calculation from a qualified engineer showing the beam, foundation or floor is correctly sized for the loads it carries, and most builders will not order steel or start groundworks without one either.
DrawingsDirect produces and coordinates structural calculations in-house alongside your architectural drawings, rather than treating them as a separate, disconnected step. That matters in practice: it is common for a beam size on a structural calculation to not quite match what is drawn on the architectural plan, which causes delays at Building Control or confusion on site when the builder is ordering steel. Because we draw the architectural set and coordinate the structural calculation together, the beam, padstone and bearing shown on your drawings are the same ones the calculation is based on. Structural drawings are available as a standalone service for a single wall or beam, or bundled into a larger extension, loft or basement building regulations package.
Do I need structural calculations to remove a load-bearing wall in London?
If a wall carries any load from above — a floor, a roof, another wall, or a chimney breast — you need a structural calculation before it can be removed, and Building Control will ask for it as part of a Full Plans or Building Notice submission. This covers the great majority of kitchen-diner knock-throughs in London terraces and semis, where the wall between the kitchen and the rear reception room is almost always load-bearing. A calculation confirms the size and type of steel beam needed to replace the wall's support, the padstones or pier that carry the beam's weight down to the foundations, and the temporary propping needed while the work is carried out. If the wall shares a boundary or the new beam bears on a party wall, the Party Wall etc. Act 1996 will also apply and needs to be dealt with separately from the calculation itself.
How steel beam sizing works
A structural engineer calculates the loads bearing down on a wall from the floors, roof and any walls above it, then sizes a steel beam (RSJ) — its depth, width and steel grade — so it can safely carry that load across the required span without excessive deflection. The calculation also fixes the bearing length at each end, the padstones or steel plates that spread the load into the surrounding masonry, and whether the existing foundations need strengthening to take the extra point loads. Because we coordinate the calculation with the architectural drawing set, the exact beam size, orientation and position shown on your plans is the one the calculation specifies — so your builder can order the correct steel first time, and Building Control sees a consistent set of drawings rather than two documents that disagree.
| Project scope | What's included | Fee guide |
|---|---|---|
| Single beam or wall removal | One steel calculation plus a drawing showing beam size, padstones and bearings | From £650 |
| Loft conversion structural package | Floor and roof loading checks, beam calculations, staircase opening design | Included within loft drawings from £1,100 |
| Rear or side extension structural package | Foundation design, steel beam calculations, roof loading checks | Included within planning and building regs packages from £2,200–£3,850 |
| Basement or retaining structure | Underpinning, retaining wall and waterproofing-adjacent structural calculations | Quoted individually — ground conditions vary |
Structural Drawings in West Hampstead NW6 — FAQs
Do I need a structural engineer to remove a wall in my London home?+
How long do structural calculations take?+
Will the steel beam on my drawings match what my builder orders?+
Can you produce structural drawings without handling my full planning application?+
Do structural calculations need to be submitted to Building Control?+
Do I need planning permission for a rear extension in Camden?+
What is a Basement Impact Assessment and will I need one in Camden?+
Can I make changes to a listed building in Camden?+
How long does Camden take to decide an application?+
How much do planning drawings cost in Camden?+
Get your free West Hampstead planning assessment
Tell us your West Hampstead (NW6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.