MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportRear Extension Drawings in Morden SM4

Loft conversion with skylights in a Merton Park cottage, Morden SM4, London Borough of Merton
Morden · SM4 · Merton

Rear Extension Drawings in Morden SM4

Fixed-fee, MCIAT-chartered rear extension drawings for Morden (SM4) homeowners — London Borough of Merton validation and local constraints handled from the start.

Free Morden planning assessment

Tell us your Morden (SM4) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Morden (SM4) sits at the southern edge of the London Borough of Merton, taking in the John Innes estate streets of southern Merton Park and the older village core around St Lawrence Church.

SM4 is shaped by two conservation areas, John Innes Merton Park and Upper Morden, the former carrying some of London's most restrictive Article 4 Directions on permitted development.

Loft conversion with skylights in a Merton Park cottage, Morden SM4, London Borough of Merton
Isometric illustration of a Morden SM4 home rear extension drawings design
Proposed floor plan
Morden SM4

Planning in Morden (SM4): what to know before you apply

Houses on the John Innes estate streets within SM4 are covered by Article 4 Directions that withdraw permitted-development rights, so changes to windows, doors, front walls and roofs there need a full planning application; the borough-wide HMO Article 4 applies across the rest of Morden.

Typical Morden housing stock

John Innes estate cottages and villas of the 1870s onward with hedged front gardens and distinctive detailing, alongside the older core around St Lawrence Church and Church Farm Cottage near London Road, and inter-war suburban housing spreading toward Morden town centre.

Streets we regularly draw for in Morden

Dorset Road · Kingston Road · London Road · Central Road · Mostyn Road

Rear Extension Drawings for Morden (SM4) homes: the package and the process

Every rear extension drawings we prepare for an Morden property is drawn to London Borough of Merton’s validation standards and tuned to the SM4 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

A single-storey rear extension is the most common way London homeowners add space, usually taking the form of an open-plan kitchen-diner that opens onto the garden through bi-fold or sliding doors, with rooflights or a roof lantern bringing daylight deep into the plan. Because depth and height are tightly controlled by permitted development rules and by the 45-degree rule that protects neighbouring windows, the design work sits as much in checking what the council will allow as in drawing what you want.

DrawingsDirect draws rear extensions for permitted development, the larger home extension prior-approval scheme and full householder planning, with structural calculations for the opening and roof produced in-house by our MCIAT-chartered team. If your project also involves widening the kitchen sideways or adding a second storey, see our Side Return, Wraparound and Double Storey Extension pages — many London rear extensions grow into one of those during design.

Do I need planning permission for a rear extension in London?

Many single-storey rear extensions qualify as permitted development, meaning no planning application is needed, provided depth, height and materials stay within set limits. That changes if your property sits in a conservation area or is subject to an Article 4 direction, both of which can remove permitted development rights across a street or borough — in that case a full householder planning application is required regardless of size.

Even where an extension qualifies, most homeowners obtain a Lawful Development Certificate to confirm that status in writing before building — useful for mortgage lenders, buyers and Building Control. We check your property against your borough's constraints before recommending a route.

How deep can a single-storey rear extension go?

Depth is the main constraint on a rear extension, and it depends on your house type and whether you use standard permitted development or the larger home extension scheme.

Permitted development

Standard permitted development allows a single-storey rear extension up to 3 metres deep for terraced and semi-detached houses, or 4 metres for detached houses, generally with eaves height limited to match or stay close to the existing house.

Larger home extension scheme

The prior-approval scheme extends this to 6 metres for terraced and semi-detached houses and 8 metres for detached houses. Your council writes to affected neighbours; if none object within the notification period, approval follows without a full planning application. If an objection is raised, the council assesses the impact on neighbouring light and outlook itself, rather than automatically refusing, so a well-considered design still has a good chance of approval.

Rear extension routes at a glance
RouteWhen it appliesTypical fee
Permitted development (Lawful Development Certificate)Depth within 3m (terraced/semi) or 4m (detached), height and materials within PD limitsPD/LDC pack ~£950–£1,450
Larger home extension (prior approval)Depth up to 6m (terraced/semi) or 8m (detached), with neighbour notificationfrom £1,100
Full householder planning permissionExtension exceeds PD/larger-home limits, or the property is in a conservation area with an Article 4 directionFull Planning pack ~£1,600–£2,400
Planning + Building Regulations (structural)Combined planning and construction-ready pack with structural calculations for the opening and roofPlanning + Building Regs pack ~£2,200–£3,850
FAQ

Rear Extension Drawings in Morden SM4 — FAQs

How much does a rear extension cost to design in London?+
Rear extension drawings start from £1,100, with the final fee set by the route your extension takes — permitted development, prior approval or full planning — and whether you need building regulations and structural calculations bundled in. The fee is fixed and agreed upfront.
Do I need an architect for a rear extension?+
No. DrawingsDirect is an MCIAT-chartered architectural technologist practice, producing the same council-accepted drawings as an architect for a fixed fee typically around 30% lower.
How long does it take to get rear extension drawings?+
Drawings are typically ready around 7 days from survey. Once submitted, councils have a statutory 8-week period to determine a standard householder planning application.
What is the 45-degree rule?+
It is a daylight test many London councils apply to check that a rear extension does not block too much light to a neighbour's nearest window, measured as a line drawn at 45 degrees from that window. We check it before submission, not after a refusal.
Will I need a Party Wall Agreement for a rear extension?+
Only if your foundations or new walls sit on or near the boundary with a neighbouring property. A straightforward rear extension set within your own plot often does not trigger the Party Wall etc. Act 1996, unlike a Side Return or Wraparound extension, which usually does.
Do I need planning permission for an extension in Merton?+
The interwar semis of Raynes Park and Morden often keep permitted development rights for rear extensions and lofts, so a full application isn't always needed. Conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate.
What is special about building at the John Innes estate in Merton Park?+
The John Innes estate is a planned Arts-and-Crafts conservation area with a distinctive character the council protects closely — materials, proportions and rooflines are all controlled. Permitted development is often restricted there, so we design to the estate's character and prepare a full, context-led application, which is the reliable route to approval.
What do Merton's HMO Article 4 directions affect?+
In designated wards, an Article 4 direction removes permitted development for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application there. It doesn't affect a standard family extension, but if you are considering an HMO we confirm whether the direction covers your address and use before advising.
How long does Merton Council take to decide?+
Merton determines most householder applications within the statutory eight-week period once validated; Wimbledon and Merton Park conservation cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Merton?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Merton approves. A suburban Raynes Park extension and a Wimbledon Village or Merton Park application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Morden planning assessment

Tell us your Morden (SM4) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.