MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Raynes Park SW20

Garage conversion and driveway on an interwar semi in Raynes Park SW20, London Borough of Merton
Raynes Park · SW20 · Merton

Planning Permission in Raynes Park SW20

Fixed-fee, MCIAT-chartered planning permission for Raynes Park (SW20) homeowners — London Borough of Merton validation and local constraints handled from the start.

Free Raynes Park planning assessment

Tell us your Raynes Park (SW20) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Raynes Park (SW20) in Merton is a predominantly Edwardian and interwar suburb, running from the terraces around the station and Grand Drive to the semi-detached streets of West Wimbledon and Cottenham Park. The consistent interwar housing means side and rear additions and loft conversions follow a well-established pattern, and Merton's expectations for that house type are clearly documented.

The Wimbledon West conservation area toward Cottenham Park is the main designated control, governing frontages and roof changes for the houses inside its boundary. We confirm where a Raynes Park property sits relative to that boundary, and check for protected street trees, before recommending a permitted-development or full-application route and drawing to Merton's residential guidance.

Garage conversion and driveway on an interwar semi in Raynes Park SW20, London Borough of Merton
Isometric illustration of a Raynes Park SW20 home planning permission design
Proposed floor plan
Raynes Park SW20

Planning in Raynes Park (SW20): what to know before you apply

SW20 has no householder Article 4 direction, so many Raynes Park houses retain permitted development rights for side, rear and loft work — but the Wimbledon West conservation area toward Cottenham Park is the exception, and Tree Preservation Orders apply to street trees on several suburban roads.

Typical Raynes Park housing stock

Edwardian terraces around Raynes Park station and the Grand Drive streets, interwar semi-detached houses across West Wimbledon and Cottenham Park, and 1930s shopping parades along the main roads.

Streets we regularly draw for in Raynes Park

Coombe Lane · Grand Drive · Worple Road · Approach Road

Planning Permission for Raynes Park (SW20) homes: the package and the process

Every planning permission we prepare for an Raynes Park property is drawn to London Borough of Merton’s validation standards and tuned to the SW20 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.

Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
FAQ

Planning Permission in Raynes Park SW20 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Merton?+
The interwar semis of Raynes Park and Morden often keep permitted development rights for rear extensions and lofts, so a full application isn't always needed. Conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate.
What is special about building at the John Innes estate in Merton Park?+
The John Innes estate is a planned Arts-and-Crafts conservation area with a distinctive character the council protects closely — materials, proportions and rooflines are all controlled. Permitted development is often restricted there, so we design to the estate's character and prepare a full, context-led application, which is the reliable route to approval.
What do Merton's HMO Article 4 directions affect?+
In designated wards, an Article 4 direction removes permitted development for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application there. It doesn't affect a standard family extension, but if you are considering an HMO we confirm whether the direction covers your address and use before advising.
How long does Merton Council take to decide?+
Merton determines most householder applications within the statutory eight-week period once validated; Wimbledon and Merton Park conservation cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Merton?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Merton approves. A suburban Raynes Park extension and a Wimbledon Village or Merton Park application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Raynes Park planning assessment

Tell us your Raynes Park (SW20) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.