MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Bexley Village DA5

Rear extension behind a Victorian cottage in Bexley Village DA5, London Borough of Bexley
Bexley Village · DA5 · Bexley

Planning Permission in Bexley Village DA5

Fixed-fee, MCIAT-chartered planning permission for Bexley Village (DA5) homeowners — London Borough of Bexley validation and local constraints handled from the start.

Free Bexley Village planning assessment

Tell us your Bexley Village (DA5) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Bexley Village (DA5) sits on the River Cray at the south-eastern edge of the borough, where the historic High Street winds down past cottages and shops to the green and St John's Church. Rear and side extensions on the Victorian and Edwardian houses ringing the old core are the most common projects here, and the village's semi-rural setting on the edge of the Metropolitan Green Belt shapes how the council reads them.

The Old Bexley Conservation Area, first designated in 1971 and extended in 1987, covers the winding High Street, the green and the riverside around the old ford, protecting 18 listed buildings and the prevailing local brick. Where a DA5 property sits relative to that boundary decides whether roofline, window and front-elevation changes are permitted development or need consent.

Rear extension behind a Victorian cottage in Bexley Village DA5, London Borough of Bexley
Isometric illustration of a Bexley Village DA5 home planning permission design
Proposed floor plan
Bexley Village DA5

Planning in Bexley Village (DA5): what to know before you apply

Inside the Old Bexley Conservation Area the Article 4(2) Direction means front-elevation, roof, window and boundary changes that would be permitted development elsewhere need a full householder application, and the 18 listed buildings additionally require listed-building consent. Beyond the boundary, on the Edwardian and inter-war streets toward the station, many rear and loft projects still fall within permitted development, so we check the boundary and the Green Belt edge before advising a route.

Typical Bexley Village housing stock

The conservation-area core is a tight grain of 18th- and 19th-century brick cottages, listed timber-framed houses and Victorian shopfronts along the winding High Street, giving way to Edwardian villas and inter-war semis on the rising ground toward Bexley station and Parkhill Road.

Streets we regularly draw for in Bexley Village

High Street · Tanyard Lane · Manor Road · North Cray Road

Planning Permission for Bexley Village (DA5) homes: the package and the process

Every planning permission we prepare for an Bexley Village property is drawn to London Borough of Bexley’s validation standards and tuned to the DA5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Securing planning permission in London means navigating borough-specific design guidance, conservation areas, Article 4 directions and a validation checklist that differs from one council to the next. DrawingsDirect prepares the existing and proposed drawings your local planning authority needs, submits them through the Planning Portal, and manages the application to a decision — for a fixed fee agreed before we start.

Because we are MCIAT-chartered architectural technologists rather than a general architecture practice, you get the same council-accepted drawings and professional accountability at a typically lower fee, with structural coordination handled in-house.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
FAQ

Planning Permission in Bexley Village DA5 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Bexley?+
Bexley has no borough-wide Article 4 direction affecting typical householder permitted development, so its semi-detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify. Conservation areas such as Old Bexley Village and Danson Park, and riverside flood-zone constraints toward Erith, restrict this. We check your address first and can confirm permitted development with a Lawful Development Certificate.
Can I build a bigger extension because Bexley plots are larger?+
Often, yes. The generous interwar plots across Bexleyheath, Sidcup and Welling make substantial rear and double-storey extensions viable where a tight terrace could not. The limit is usually design and amenity policy rather than space. We design to use the plot fully within permitted-development allowances or a well-evidenced full application.
What extra control applies in Old Bexley Village or around Danson Park?+
These conservation areas carry design control over materials, rooflines and front elevations, and the Upton area of Bexleyheath includes the setting of William Morris's Red House. Permitted development is often restricted there, so we design to the area's character and prepare a full, context-led application where a standard permitted-development route doesn't apply.
How long does Bexley Council take to decide?+
Bexley determines most householder applications within the statutory eight-week period once validated; conservation cases can involve additional consultation. A complete, correctly scaled submission is the best way to avoid a validation query — we prepare Bexley drawings to the council's checklist to keep the application on track.
How much do planning drawings cost in Bexley?+
We quote a fixed fee upfront, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Bexley approves. Because plots here allow larger schemes, the fee tracks complexity — a single-storey rear differs from a double-storey — and we confirm it once we understand your plans.
Free Fixed Quote

Get your free Bexley Village planning assessment

Tell us your Bexley Village (DA5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.