
Planning Drawings in Wembley Park HA9
Fixed-fee, MCIAT-chartered planning drawings for Wembley Park (HA9) homeowners — London Borough of Brent validation and local constraints handled from the start.
Wembley Park (HA9) includes the 1930s Barn Hill Estate, where Haymills houses are arranged around landscaped greens, so extensions here have to sit comfortably within a carefully composed group rather than stand alone.
Part of Barn Hill is a conservation area with an Article 4 direction covering front-facing changes, so we confirm whether a property lies inside the designation before advising on permitted development versus a householder application.


Planning in Wembley Park (HA9): what to know before you apply
In the Barn Hill conservation area the Article 4 direction means visible alterations need consent and a householder application is usual. Rear extensions and lofts that respect the estate's building lines and landscaping remain achievable.
Typical Wembley Park housing stock
The Barn Hill Estate was developed by Haymills from 1932 on the hill above Wembley Park. Its houses are grouped around greens with mature landscaping, and the juxtaposition of buildings and planting gives the area its protected character.
Streets we regularly draw for in Wembley Park
Barn Rise · Grendon Gardens · The Leadings · Barn Hill
Planning Drawings for Wembley Park (HA9) homes: the package and the process
Every planning drawings we prepare for an Wembley Park property is drawn to London Borough of Brent’s validation standards and tuned to the HA9 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.
Planning drawings are the scale drawings a London council uses to judge your application: existing and proposed floor plans, elevations, sections and site plans that show the design, scale and neighbour impact of your project. DrawingsDirect produces complete, validation-ready planning drawing sets for extensions, lofts and conversions across London.
What is included in a planning drawing set?
A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.
- Site location plan (1:1250) and block plan (1:500)
- Existing floor plans, elevations and sections
- Proposed floor plans, elevations and sections
- Roof plans where relevant, with heights and materials annotated
- A design and access or heritage statement where the borough requires one
How are planning drawings different from building regulations drawings?
Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.
| Drawing | Typical scale | What it shows |
|---|---|---|
| Site location plan | 1:1250 | The property in its street context, site edged red |
| Block plan | 1:500 | The building's footprint and position in the plot |
| Floor plans (existing & proposed) | 1:100 / 1:50 | Room layout, walls, openings and the proposed changes |
| Elevations (existing & proposed) | 1:100 / 1:50 | Each face of the building and how it changes |
| Sections | 1:100 / 1:50 | A cut through showing heights, levels and roof form |
Planning Drawings in Wembley Park HA9 — FAQs
What scale should London planning drawings be?+
Do I need an architect to produce planning drawings?+
How many revisions are included in the fee?+
Can you draw from my existing plans?+
Do planning drawings guarantee approval?+
Do I need planning permission for a side-return extension in Brent?+
What does Brent's borough-wide HMO Article 4 direction affect?+
Is a hip-to-gable loft conversion allowed on my Brent semi?+
How long does Brent Council take to decide?+
How much do planning drawings cost in Brent?+
Get your free Wembley Park planning assessment
Tell us your Wembley Park (HA9) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.