MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportMeasured Building Survey in Kentish Town NW5

Commercial to residential conversion drawings in Kentish Town NW5, London Borough of Camden
Kentish Town · NW5 · Camden

Measured Building Survey in Kentish Town NW5

Fixed-fee, MCIAT-chartered measured building survey for Kentish Town (NW5) homeowners — London Borough of Camden validation and local constraints handled from the start.

Free Kentish Town planning assessment

Tell us your Kentish Town (NW5) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Kentish Town (NW5) is predominantly Victorian, with two conservation areas — Dartmouth Park on the rising ground to the north and Inkerman in the streets off Kentish Town Road — and Camden's Article 4 layer over the top. It is a district where the difference between one street and the next genuinely changes the route to consent.

Camden's Basements direction removes permitted development rights for basement works throughout, so lower-ground schemes need a full application. The Class E to C3 direction, in its outside-the-CAZ form, removes the permitted commercial-to-residential change here — which matters along Kentish Town Road and Fortess Road, where the shop-to-flat conversion is a common project and now needs planning rather than prior approval. In the Dartmouth Park and Inkerman conservation areas, frontages and rooflines are controlled, and the rise toward Dartmouth Park Hill means rear extension levels and overlooking are assessed against the slope. We check the boundaries and the Article 4 position for an NW5 address before drawing to Camden's guidance.

Commercial to residential conversion drawings in Kentish Town NW5, London Borough of Camden
Isometric illustration of a Kentish Town NW5 home measured building survey design
Proposed floor plan
Kentish Town NW5

Planning in Kentish Town (NW5): what to know before you apply

NW5 falls under Camden's Basements Article 4 direction, removing permitted development rights for basement works, and the outside-CAZ Class E to C3 direction, which removes the permitted commercial-to-residential change — so shop-to-flat conversions along Kentish Town Road and Fortess Road need full planning applications rather than prior approval. The Dartmouth Park and Inkerman conservation areas control frontages and rooflines, and the rising ground toward Dartmouth Park Hill brings level and overlooking assessments into rear extension design.

Typical Kentish Town housing stock

Victorian terraces through the centre and along Fortess Road, larger Victorian semi-detached and terraced houses climbing Dartmouth Park Hill, and a substantial share of the stock converted to flats.

Streets we regularly draw for in Kentish Town

Kentish Town Road · Fortess Road · Dartmouth Park Hill · Lady Margaret Road

Measured Building Survey for Kentish Town (NW5) homes: the package and the process

Every measured building survey we prepare for an Kentish Town property is drawn to London Borough of Camden’s validation standards and tuned to the NW5 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Every accurate drawing starts with an accurate survey. Before any proposed extension, loft conversion or alteration can be designed, we need to know exactly what already exists — the true dimensions of each room, the position and size of every door and window, floor-to-ceiling heights, wall thicknesses, roof pitches and the exact shape of the plot. A measured building survey captures all of this on site using a laser distance meter, recording existing plans, elevations and sections to millimetre accuracy, rather than relying on old estate agent floor plans, a previous owner's drawings, or rough on-site guesswork.

This matters more than it might seem. A design drawn on top of an inaccurate existing survey can look correct on paper and then not actually fit once a builder is on site — a wall that is 200mm out of position, a ceiling height that is lower than assumed, or a roof pitch that does not match reality can all force a costly redesign mid-build. A fresh, laser-measured survey de-risks that from the outset: the proposed extension, loft conversion or internal alteration is designed against the real dimensions of your home, not an approximation, so what is drawn is what can actually be built.

Why does a planning or building regulations application need a measured survey?

A planning or building regulations application needs to show the existing building accurately alongside the proposed changes, so the council or Building Control can judge the impact of the work against what is actually there. Existing plans, elevations and sections drawn from an accurate measured survey give the borough confidence that the proposal has been designed against real dimensions, and give your builder a reliable set of drawings to price and build from — an application based on inaccurate or assumed dimensions risks queries, delays, or a design that does not translate cleanly on site.

What does a measured building survey capture?

The survey records everything needed to produce accurate existing drawings: internal room dimensions and floor-to-ceiling heights on every level, the position, width and height of every door and window, wall thicknesses, staircase dimensions and headroom, roof shape and pitch, chimney breasts and structural features, and the external footprint and boundary relationship of the property. Where relevant to the project, we also record ground levels, existing drainage runs and neighbouring boundary conditions.

This is captured with a laser distance meter rather than a tape measure, which keeps the survey accurate to within a few millimetres across a whole property and removes the cumulative measuring error that can creep into a hand-measured survey of a larger or more complex building.

What a measured survey feeds into
Output drawingRelies on the measured survey for
Floor plansAccurate room dimensions and layout for sale, letting or lease use
Planning drawingsExisting plans, elevations and sections to compare against the proposal
Building regulations drawingsAccurate existing structure to design technical compliance against
Structural calculationsTrue spans, floor-to-ceiling heights and existing structural elements
FAQ

Measured Building Survey in Kentish Town NW5 — FAQs

How much does a measured building survey cost?+
A measured building survey starts from £450, or is included as the first stage of a planning, building regulations or architectural drawing package, depending on the size and complexity of the property.
How long does a measured survey take?+
The site visit itself typically takes a few hours depending on the size of the property, with existing drawings produced from the survey data shortly afterwards as the basis for the next stage of your project.
Is a measured survey the same as a floor plan?+
A measured survey is the site data-capture process; floor plans are one of the outputs drawn from it. The same survey can also produce elevations, sections and the existing-layout base drawing for a planning application.
Do I need a measured survey if I am only doing internal work?+
Usually yes if you are removing or altering walls, since accurate existing dimensions and structural features are needed to design and calculate the changes safely, even where no planning application is required.
Can the survey be used for more than one purpose?+
Yes — a single measured survey typically underpins floor plans, planning drawings, building regulations drawings and structural calculations for the same project, so it only needs to be carried out once.
Do I need planning permission for a rear extension in Camden?+
Frequently, yes. Much of Camden sits within a conservation area or is listed, and near-borough-wide conservation coverage removes permitted development for many external works. On unlisted homes outside a conservation area a rear extension may still qualify, but in Hampstead, Belsize Park and Primrose Hill a full application is usually needed. We confirm the exact constraints for your address before drawing.
What is a Basement Impact Assessment and will I need one in Camden?+
Camden operates one of the most rigorous basement policies in London. Schemes involving a basement or lower-ground extension generally require a Basement Impact Assessment addressing structural stability, drainage and groundwater. If you are considering below-ground space we flag the requirement early and coordinate the assessment so the application is complete when it is submitted.
Can I make changes to a listed building in Camden?+
Often, but listed-building consent is usually required alongside — or instead of — planning permission, and internal as well as external changes can be controlled. Camden has a high density of listed buildings in Hampstead, Bloomsbury and Fitzrovia. We screen listing status for your address first and prepare the heritage-led drawings and justification the council expects.
How long does Camden take to decide an application?+
Camden determines most householder applications within the statutory eight-week period once validated; basement, conservation and listed-building cases can involve additional consultation. We prepare Camden submissions to the council's validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Camden?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Camden approves. A conservation-area rear extension, a basement and a listed-building scheme differ in the evidence required, so we quote once we have seen your project rather than by the hour.
Free Fixed Quote

Get your free Kentish Town planning assessment

Tell us your Kentish Town (NW5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.