MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportHouse Extension Drawings in Southgate Green N14

Rear extension drawings for a period house at Southgate Green N14, London Borough of Enfield
Southgate Green · N14 · Enfield

House Extension Drawings in Southgate Green N14

Fixed-fee, MCIAT-chartered house extension drawings for Southgate Green (N14) homeowners — London Borough of Enfield validation and local constraints handled from the start.

Free Southgate Green planning assessment

Tell us your Southgate Green (N14) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Southgate (N14) is anchored by Southgate Green, a historic green ringed by Georgian and Victorian houses and more than thirty listed structures, with Edwardian and interwar semis on the surrounding streets where most of our extension and loft work sits.

Because the Article 4(2) directions made in 2009 remove permitted-development rights on frontages inside the conservation area, we check the mapped boundary and listing status before advising whether a scheme is genuinely PD or needs a full application with heritage justification.

Rear extension drawings for a period house at Southgate Green N14, London Borough of Enfield
Isometric illustration of a Southgate Green N14 home house extension drawings design
Proposed floor plan
Southgate Green N14

Planning in Southgate Green (N14): what to know before you apply

Most Southgate extensions run as householder applications to Enfield, with a heritage statement where the property is inside the Southgate Green Conservation Area. The 2009 Article 4(2) directions remove PD rights on street-facing elevations, and listed-building consent can be required near the green, so we confirm boundary and listing status first.

Typical Southgate Green housing stock

A historic green fringed by Georgian and early Victorian houses and over thirty listed buildings and structures, giving way to Edwardian and interwar semis and villas on the surrounding N14 streets around Conway Road.

Streets we regularly draw for in Southgate Green

The Green · Conway Road · Waterfall Road · Ulleswater Road

House Extension Drawings for Southgate Green (N14) homes: the package and the process

Every house extension drawings we prepare for an Southgate Green property is drawn to London Borough of Enfield’s validation standards and tuned to the N14 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

A well-drawn extension adds space and value while sailing through the council; a poorly-drawn one triggers objections and refusals. DrawingsDirect draws rear, side-return, wraparound, double-storey and basement extensions for London homes — sized to your borough's tolerances, with daylight and neighbour impact considered before the planners raise them.

Which extension types do you draw?

Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.

Rear extension

A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.

Side-return

Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.

Wraparound

Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.

Double-storey

Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.

Basement

Creates space downward where footprint is limited, with structural and party-wall care.

Do I need planning permission for a house extension in London?

Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing.

Typical London extension drawing packages
ExtensionTypical routePackageFee from
Single-storey rearPermitted development / householderPlanning + building regs£1,100
Side-returnHouseholder planningPlanning + building regs + structural£1,600
WraparoundHouseholder planningFull package + structural£2,200
Double-storeyHouseholder planningFull package + structural£2,400
FAQ

House Extension Drawings in Southgate Green N14 — FAQs

How far can I extend without planning permission in London?+
Under permitted development, single-storey rear extensions can reach 3m (terraced/semi) or 4m (detached), or up to 6–8m under the prior-approval larger-home scheme — but conservation areas and Article 4 directions can remove these rights. We check your property first.
Do extension drawings include structural calculations?+
Our full package includes structural drawings and calculations coordinated in-house, so your builder can price and build without waiting on an engineer.
How long do extension drawings take?+
Typically about 7 days from survey to a full drawing set delivered to your online portal.
Will my rear extension need a party wall agreement?+
If you build up to or on a shared boundary, excavate near a neighbour's foundations, or cut into a party wall for a steel, the Party Wall etc. Act 1996 usually applies. Our drawings show the works clearly so a party wall surveyor — or your neighbour — can see exactly what is proposed, which keeps that process quick.
Can I extend a house in a conservation area?+
Yes, but conservation areas and Article 4 directions commonly remove permitted development for rear and side extensions, so the work needs a full householder application designed to the council's heritage guidance. We confirm your property's designation before recommending a route.
Do I need planning permission for a loft or extension in Enfield?+
Across Edmonton, Palmers Green and Enfield, the borough's interwar semis usually keep permitted development rights for rear extensions and hip-to-gable or dormer lofts, so a full application isn't always needed. Conservation areas such as Bush Hill Park and Winchmore Hill, and green-belt land to the north, remove or restrict those rights. We check your address first and confirm permitted development with a Lawful Development Certificate where it applies.
How does green-belt land affect my Enfield project?+
On green-belt properties toward the borough's northern edge, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
What does Enfield's borough-wide HMO Article 4 direction affect?+
Enfield applies a borough-wide Article 4 direction removing permitted development rights for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application anywhere in the borough. It doesn't affect a standard family extension, but we confirm whether it applies to your intended use before advising.
How long does Enfield Council take to decide?+
Enfield determines most householder applications within the statutory eight-week period once validated; conservation and green-belt cases can involve additional consultation. We prepare Enfield submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Enfield?+
We agree a fixed fee before starting, usually around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Enfield approves. A suburban loft and a green-belt or conservation case differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Southgate Green planning assessment

Tell us your Southgate Green (N14) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.