MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportBuilding Regulations Drawings in Greenford UB6

Rear extension on an interwar semi in Greenford UB6, planning drawings for Ealing Council approval
Greenford · UB6 · Ealing

Building Regulations Drawings in Greenford UB6

Fixed-fee, MCIAT-chartered building regulations drawings for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.

Free Greenford planning assessment

Tell us your Greenford (UB6) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.

The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.

Rear extension on an interwar semi in Greenford UB6, planning drawings for Ealing Council approval
Isometric illustration of a Greenford UB6 home building regulations drawings design
Proposed floor plan
Greenford UB6

Planning in Greenford (UB6): what to know before you apply

No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.

Typical Greenford housing stock

Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.

Streets we regularly draw for in Greenford

Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue

Building Regulations Drawings for Greenford (UB6) homes: the package and the process

Every building regulations drawings we prepare for an Greenford property is drawn to London Borough of Ealing’s validation standards and tuned to the UB6 constraints above. Here is what the drawing package covers and how the process runs from first survey to approval.

Where planning drawings gain design consent, building regulations drawings prove your project meets the technical standards for a safe, warm, structurally sound building. DrawingsDirect produces full-plans building control packages for London extensions, lofts and conversions, with structural calculations produced in-house rather than subcontracted.

What do building regulations drawings cover?

A building control package translates the approved design into a buildable, compliant specification.

  • Construction sections and detailed junctions
  • Structural drawings and calculations (steel beams, foundations, loadings)
  • Part L thermal performance and insulation specification
  • Fire safety — escape routes, protected structure, alarms
  • Drainage and ventilation layouts

Full Plans or Building Notice — which should I choose?

A Full Plans application has your drawings checked and approved by Building Control before work starts, giving certainty and a document lenders and buyers like to see. A Building Notice lets simpler work start sooner but is inspected as it proceeds, with less up-front certainty. For most London extensions and loft conversions we recommend Full Plans, and prepare the package accordingly.

Full Plans vs Building Notice for a London project
FactorFull PlansBuilding Notice
Drawings checked before work startsYesNo
Up-front certaintyHigh — approval in writingLower — inspected as built
Best forExtensions, lofts, structural workMinor, simple works
Evidence for lenders and buyersFull approval recordCompletion certificate only
Risk of costly on-site reworkLowHigher if issues are found late
FAQ

Building Regulations Drawings in Greenford UB6 — FAQs

Do I need building regulations approval as well as planning permission?+
Almost always, yes. Planning permission covers what the building looks like; building regulations cover how safely it is built. Most extensions and loft conversions need both.
How long does Building Control approval take?+
A Full Plans application is typically assessed within about five weeks. We prepare a complete package and respond to any conditions promptly, so approval is not held up by missing detail.
Can building regulations drawings be done after planning approval?+
Yes. Many homeowners secure planning permission first, then commission the building regulations package before starting on site. We can pick a project up at either stage.
Are structural calculations included?+
Yes — we produce structural drawings and calculations in-house as part of the building regulations package, so your builder has everything to price and build.
Can you submit to Building Control for me?+
Yes, we prepare and submit the Full Plans package and respond to any Building Control queries.
Do I need planning permission for a rear extension in Ealing?+
Many Ealing semis and terraces keep permitted development rights for a single-storey rear extension, so a full application isn't always needed. But the borough-wide Article 4 direction on HMO conversions, and conservation areas such as Bedford Park and Pitshanger, remove or restrict those rights in places. We check your address against the designations first and, where it qualifies, confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. A standard permitted-development dormer or cladding change usually won't apply; instead we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects — the reliable route to approval there.
How long does Ealing Council take to decide a householder application?+
Ealing determines most householder applications within the statutory eight-week period once they are validated. The commonest cause of delay is a validation query over missing or inconsistent drawings, so we prepare Ealing submissions to the council's validation checklist — correctly scaled existing and proposed plans, elevations and a location plan — to avoid that back-and-forth.
Can you help with a loft conversion on a 1930s Ealing semi?+
Yes. Ealing's Metro-land semis in Perivale, Greenford and Northolt suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development on semi-detached homes within the volume limits. We confirm eligibility against those limits and any Article 4 or conservation constraint, then produce the planning and building-regulations drawings.
How much do planning drawings cost in Ealing?+
We work to a fixed fee agreed before we start, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing grants approval. The exact figure depends on the project — a single-storey rear extension differs from a double-storey or a loft — so we quote once we understand your scheme rather than on an open-ended hourly basis.
Free Fixed Quote

Get your free Greenford planning assessment

Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.